The Estes Dr./MLK, Jr. Intersection: Crossroads to Chapel Hill’s Future

The following letter does an excellent job summing up my reasons for delaying the July’s abbreviated community review process for the ciritical Estes Drive/MLK, Jr. intersection, the two congested transit corridors and the surrounding area which includes UNC’s Carolina North campus.

The current CH2020 proposal calls for us to plan in haste and repent in crisis.

This intersection is a bulls-eye for development activities and lies at the crossroads of competing goals: creating an appropriate gateway to UNC’s Carolina North, managing a critical transition point between Downtown and North Chapel Hill/Carrboro and East Franklin St., supporting the new transit framework for MLK, Jr. and acting as the template for the ring of development around Horace-Williams Airport.

In many ways, it is one of the most critical areas in Town and deserves a thorough, deliberative and broad-based community evaluation before moving forward.

The following letter asks Council to take the time to “get it right”.

June 23, 2012

Dear Mayor and Town Council,

We are residents of Estes Hills, Huntington-Somerset, Coker Hills, Coker Hills West, Mount Bolus and Coker Woods and would be affected if zoning changes are made to the Town’s land use map in our area.

The Estes Neighbors group strongly recommends that the CH2020 Plan expand the scope of the proposed Estes Corridor study to include all or most of the ‘MLK South future focus area’, and develop a robust, deliberative and broadly inclusive community outreach effort to build a consensus for managing development prudently within that focus area. Two hundred and eight of our neighbors have signed on to that vision.

By definition a small area plan needs to include a larger area than the small strip along Estes Drive. The Estes/MLK,Jr. intersection is a critical element of several overlapping concerns: a gateway to Carolina North, a current traffic bottleneck, and a key transition point between downtown and north Chapel Hill and Carrboro.

We recommended a focus area plan that covers Estes Drive Extension to Seawell School Road and MLK from Homestead south to Hillsborough Street, including Carolina North. Further, the focus effort must answer the following open questions:

(1) What land uses in this MLK South focus area are most compatible with the new Carolina North campus, the biggest change in our Town for decades?
(2) How will future development be effectively integrated with the Carolina North MLK transit plans to ensure continued mobility for residents, commuters, and transit access to Carolina North?
(3) How will the anticipated development affect our neighborhoods?

Summer is not the time for this critical planning effort. Many stakeholders are away on vacations, the Council is not in session, no clear process has been described, and not enough time will have passed for residents to have adequately digested the new CH2020 plan. Fall is a better time to start a robust, inclusive and sustained community process,
ensuring both strong participation and one resulting in broad community support. We anticipate several rounds of discussions and community evaluations of draft proposals extending into 2013.

Our recommendation: We request that the language making the Estes Corridor study a priority be removed. See p.45 of the Implementation Chapter in the June 25th DRAFT Comprehensive Plan.

Not only is this narrow strip of land an insufficient basis for planning, we also don’t know of any instance in the 2020 discussions where such a study emerges as a priority. We think it makes good sense to complete an integrated area plan for the MLK and Estes focus area before any changes are contemplated for Estes Drive.

In addition, we ask the Council that the final Comprehensive Plan contain a detailed process to develop area plans for all future focus areas, including:
(1) participation by citizens;
(2) adequate time to do the job;
(3) enough data to support assumptions and justifications; and finally
(4) how area plan recommendations will be turned into changes on the zoning map.

We ask that the area plan process be built in consultation with the affected neighborhoods, the University, property owners, businesses and interested residents. We envision something much more detailed and rigorous than the 15-501 south discussions, but shorter than the Glen Lennox process for all these areas. Development within each of these areas will impact not only the surrounding neighborhoods but all of Chapel Hill.

Thank you for considering these changes.

Sincerely,

David Ambaras, Mary Andersen, Stephen P. Berg, Kim and MaryEllen Biechele, Jill Blackburn, Watson Bowes M.D., Laurie Cousart, Rose Marie D’Silva, Glen H. Elder Jr, Verla Insko, Patty Krebs, Fred Lampe, Ross and Winsome Leadbetter, Emily Lees, Ronald C. and Sue Link, Julie McClintock, Sarah K. McIntee, John Morris, Priscilla Murphy, Nelson and Diane Price, Sandy Turbeville, Pat Lowry,Will Raymond, David Robinson, Steve Rogers, Gretchen Stroemer, Susan Swafford, Misako Toda, Alan Tom, Barrie Trinkle, and Cathy Walker

Density, 2008

In forming the new Comprehensive Plan initiating committee, the Mayor studiously avoided recruiting members of the Sustainability Visioning Task Force who challenged the narrow approach foisted upon that effort by staff.

The concerns raised by those committee members (Sustainability Task Force: The Whole or The Sum of the Parts? ) are unlikely to be addressed by the currently constituted group.

Without those dissenting voices, the Comprehensive Plan Initiating Committee will most likely craft a process that is targeted towards a particular outcome rather than one that will illuminate and resolve the discrepancies and omissions in our current Comprehensive Plan discovered by that task force.

Those gaps have led to development outcomes which our community has found troubling.

December, 2008 the Neighborhoods for Responsible Growth held a forum on development density which highlighted some of the issues which have to be addressed in the new plan to meet the future needs of this community. It’s a long forum but worth reviewing to get a sense of the rising tide of negative community reaction to the current “rah rah growth at any cost” approach which has failed to yield the advertised results.



Northside Memories

A couple excellent student driven articles on Northside appeared this week.

Carrboro Commons’ Megan Gassaway published this article which reviews the history of the Northside community through long time resident Ms. Keith Edwards eyes.

Too often local media focuses narrowly on the business of carving up the community rather than providing a broader context – injecting the human dimension into the story – which better informs the wider community on why folks living in Northside mourn its passing.

Courtesy ReeseNews

Reese News,UNC School of Journalism & Mass Communication’s Digital Newsroom, leverages the power of the multimedia ‘net to give voice to 10 community members’ concerns in their story The struggle for a neighborhood.

It’s no secret that Northside isn’t the neighborhood it used to be.

The change is visible in the increased diversity of its residents and the ten-story high-end condominiums that tower across from the traditionally working class neighborhood, where massive duplexes are replacing single-family homes. Change is also evident in  the growing tension and frustration of residents in a neighborhood plagued by the effects of gentrification.

The pressure for development is taking its toll on the historically black neighborhood, and the town is struggling to balance the need to grow with the needs of neighborhoods like Northside.

Since 2010, the town has been working with the Raleigh-based consultant KlingStubbins to develop a Downtown Framework and Action Plan, which could revise and redevelop parts of downtown Chapel Hill and the surrounding areas.

The downtown proposal could have significant effects on Northside. In its current draft, the framework suggests building new road connections and parking decks in areas where homes currently stand. It also underscores certain areas of Northside as prime for redevelopment.

Well done folks!

Want a bit of additional perspective on the development pressures facing Northside?

IndyWeek reporter (and former Daily Tar Heel editor) Joe Schwartz put together another excellent overview last June (2010): Greenbridge: A new chapter in a tense history .

Greenbridge, as reported by the Chapel Hill News, faces its first foreclosure hearing next Tuesday. This Sunday they promise a further exploration of not only Greenbridge’s problems but other Downtown developments putting pressure on Northside, Cameron Ave. and Pine Knolls neighborhoods.

Change is going to happen. The question is how the whole of our community can benefit from that change. Articles like these help create a broader perspective, one that has been missing so far, in the discussions over development policy Downtown.

It is critical that the nearby neighborhoods play a vital role in determining their own fates. Until their voices are heard and their neighborhoods are treated like living, breathing communities rather than convenient parcels of land for future development, our development policy is as broken as Greenbridge’s financing.

Phase I 2011 Affordable Housing Community Outreach Wraps Up

Today is the final meeting in a several week series of outreach sessions seeking community input to help formulate a new Affordable Housing Strategy for Chapel Hill. Staff sought advice from a broad range of local residents – from current affordable housing residents to professionals managing a wide variety of community programs.

Council, after a bit of prodding and plans spinning awry, wisely recognized there are some structural problems with our current affordable housing approach. Beyond acknowledging the need to rebalance our selection of affordable housing options, Council, on the heels of Greenbridge’s financial difficulties, has finally started to understand some of the inherent risks with their current policy (issues they were made aware of prior to their approval of Greenbridge, East54 and West140 luxury condo projects).

BACKGROUND The Town Council has directed staff to develop an Affordable Housing Strategy. In order to develop a strategy that is inclusive and reflective of the community’s concerns, staff has been conducting focus group sessions with affordable housing stakeholders as well as groups who may not be traditionally associated with the topic.

PURPOSE The purpose of this meeting is to obtain feedback from the community about affordable housing in Chapel Hill. This focus group session is being held for anyone in the community who would like to offer their input about the topic of affordable housing. For more information about this effort, please visit to the following website: http://www.townofchapelhill.org/index.aspx?page=1657

I’ll be attending today’s meeting in order to get a sense of what lessons the Affordable Housing Technical Advisory committee has learned from our community over the last month.

Easthom: Let’s Revisit Lake Jordan

Tomorrow Council member Laurin Easthom is petitioning her colleagues to sharpen up their decision to allow Orange Water and Sewer (OWASA) tap Lake Jordan for less than dire and near catastrophic need.

Several weeks ago Chapel Hill approved an amendment to language of the 2001 Water and Sewer Management, Planning and Agreement (WSMPBA) which gave OWASA much more leeway in tapping OWASA’s 5 million gallon per day (5Mg/d) allocation from Lake Jordan. At that time there wasn’t much sustained discussion of the long-term impacts or broader dimensions before adopting the amendment.

I attended the Jan. 27th OWASA Board meeting where the proposed loosening of the reins was first discussed and then approved [MINUTES].

In selling the need for the modification to his fellow board members, Gordon Merklein, the Chair of OWASA’s Board and UNC’s Executive Director Real Estate Development related a conversation he had with his colleague Carolyn Elfland, UNC’s Associate Vice Chancellor for Campus Services. He said that Carolyn expressed concern that UNC wouldn’t have access to that 5Mg/d allocation and desired an agreement that solidified UNC’s future ability, through OWASA, to get at Lake Jordan’s supplies.

That was a bit disconcerting as local policymakers had fairly consistently rejected tapping Lake Jordan for anything other than the most extreme of needs.

Not only have elected folks the last two decades worked hard to secure and protect the watersheds OWASA claimed were sufficient to supply our needs for the next 100 years but adopted land-use and building ordinances that conserve the resources we already have.

Of course, as I said at the time (Water,Water,Everywhere…), at the base of this discussion is a decision, which the community has supported, to live within our local footprint. Time after time the community has been in the forefront of protecting that valuable asset – most recently challenging the County’s siting of a trash transfer station in a critical watershed area and questioning OWASA’s proposed timbering operations.

The loose language of the adopted amendment puts that community-supported principle at risk.

Luckily Carrboro, a party to the agreement, stepped in and rejected the current proposal (Water, Water, Everywhere? Carrboro Holds The Line).

In light of their rejection and the continued concerns of local environmentalist, I applaud Laurin’s effort to put this decision back before her colleagues for closer inspection.

Council Member Laurin Easthom petitions the Council to place the Water and Sewer Management, Planning, and Boundary Agreement resolution (2011-02-28/R-5) recently passed by the Council back on the agenda for further Council discussion.

No Green For Greenbridge

Looks like the rumors I’ve been hearing for the last few months are true, the much touted Greenbridge project is in deep financial trouble. The high-density development (which has saved Downtown according to the local Chamber of Commerce director Aaron Nelson) hasn’t been able to sell units and pay its construction bills according to today’s N&O.

Most of the “successful” sales have been the moderately priced affordable units. Those are the same units Mayor Pro Tem Jim Ward wanted a report from staff on to verify that they were serving the broader community instead of housing well connected community members or graduate students. Most of the current sitting Council enthusiastically endorsed Greenbridge, creating a new Downtown zoning district and then granting variances on density and height above and beyond the new zones limits, because they bought into this new model of development.

With the Town’s similar joint project with RAM Development (West140) just underway, now would be a good time to reflect on the lessons that can be learned from Greenbridge’s difficulties.

Comprehensive Plan Refresh, A New Toolbox

Probably the best Council comment during Monday’s Comprehensive Plan discussion came from Ed Harrison.

Ed, who often relates how his neighborhood straddles the Orange/Durham county border, explained how Durham has newly integrated a set of tools in its comprehensive plan to guide both developers and staff.

The effort was spurred, Ed said, primarily by the planning staff, who wanted a better “planning toolbox” to manage the sprawling growth we often associate with Durham. That refresh complements the joint Durham County/City UDO (unified development ordinance) and extends beyond simply affirming base principles by integrating specific small area, transit and economic development initiatives and plans.

During next week’s Council Planning Retreat, Ed’s colleagues should take a few moments ahead of time to review Durham’s work with an eye towards integrating “lessons well-learned” from our neighbor’s work into our own new effort.

Comprehensive Plan – Compromise or Consensus?

Last night Mike Collins and George Cianciolo (current and former heads of the Planning Board) laid out an interesting plan of action to move the Town’s planning process forward.

Most importantly, they underlined the need for a more measurable, nuanced plan that works as an adjunct to the current Comprehensive Plan. Their plan also emphasized “consensus from all stakeholders” – a bit difficult if the members of the task force (if there is one) can’t compromise.

Achieving compromise was one of the more difficult things the Sustainable Community Visioning Task Force faced given the wide diversity of interests and motivations expressed by the group. An unfortunate downside of a “consensus only” approach – key issues were not addressed because of vested interest in a particular outcome. Most notably, when a significant portion of the group pushed to make measurable goals and an acknowledgement of constraints to growth a key tenet, a couple of folks were able to derail that effort.

With such a diverse membership and a widely divergent set of agendas, I expected the group to have difficulty coming to some kind of consensus which is why I proposed we first create a framework for discussing development trade-offs. I thought that we should create a decision-matrix that would factor out those things we could objectively measure, those things we could effectively estimate and those subjective things – like the value of natural beauty – which will probably forever be in the eye of the beholder.

How do we measure those impacts (if they are measurable)? Are the consequences localized or not? Given limited local resources, what upper limit exists if we want to live within our own footprint? How much brown-field is available for redevelopment? Are there restrictions on redevelopment is an area based on the Town’s resource conservation or neighborhood conservation districts? If we overlay all the restrictions imposed by conservation and watershed protection ordinances, by the LUMO (land-use management ordinance) and the underlying development zones, what does Chapel Hill look like?

A very select minority of members, along with staff, did not want to create a decision-matrix to help the group find their way. There was some argument, for instance, whether measuring impacts mattered or if resources, like water, were a limiting factor when the community could purchase it from neighboring municipalities or draw if from Jordan Lake.

Matt Czajkowski made the same argument last night when he said that the new effort would succeed if the membership had a way to discuss, evaluate, measure various trade-offs – to decide what course best to chart.

For that, as he pointed out, consensus would be great but not required. Compromise, though, should fully be expected.

Having gone through one recent iteration of this effort with the SCVTF, it is clear we must start from first principles – establish those elements which are measurable, those which aren’t – and create a clear process for working towards a consensus without requiring a consensus.

Comprehensive Plan Refresh, Long Overdue

The former and current Planning Board chairs made a concerted call for a long overdue refresh of the Town’s Comprehensive Plan.

This refresh and elaboration on the existing plan is long overdue. I started calling for a re-evaluation 6 years ago when the original plan had an already scheduled a review of the underlying assumptions and requirements.

Tonight former Sustainability Task Force members Del Snow, Madeline Jefferson and myself suggested a few ways to achieve a usable product in the not too distant future.

Below, my comments:

I welcome the Council’s interest in refreshing the Comprehensive Plan – it’s been a long time coming.

By 2004 it was obvious that the generic quality of many of the plan’s aspects were not achieving the goals originally expressed by the community. Anyone who has reviewed development applications over the last decade will note how the same language in the plan is copy-n-pasted into those applications to justify wildly divergent developments.

In January, 2005 there was an effort to get the Council to refresh the comprehensive plan in light of the many changes going on in Town – including a move from the previously favored MVU type developments like Meadowmont and Southern Village to the more high density, multi-modal projects like East54. Council initially expressed support for the effort and by October, 2006 the Planning Board had made a series of recommendations which, unfortunately, ended up being rejected.

Over the years since there have been several attempts to resuscitate that effort and – more importantly – fill in the gaps between the goals of a plan that, by necessity, remain broad and the need for more measurable requirements.

Most recently, March 2010, part of the Sustainability Task Force called for an effort to not only review some of the tenets in the plan (Sustainability Task Force: The Whole or The Sum of the Parts?) but to look at introducing a further level of refinement – including objectively measurable goals and a core recognition that there are constraints to growth.

Now, nearly a year later, it appears the Council is ready to move forward.

I’m a bit concerned that Council will rely on internal staff and consultancies to drive the process. Whatever you decide the community must play the dominant role in moving forward.

The current plan is quite broad, has a lot of moving parts, took years to formulate. I strongly suggest that while we remain aware of the inter-play between various components that the refresh is broken into distinct parts.

Council needs to prioritize and set clear expectations while also dividing the work into pieces that can be dealt with in a timely way – in a way that will have direct impact sooner than later.

Having said that, I also remind you of what Amy, Del, Madeline and I said last March: look at the big picture, provide specificity, acknowledge constraints and plan from the beginning for iterative community input.

Finally, we can no longer pretend what happens in one part of the community doesn’t affect another part.

Development impacts do spread beyond the property line.

We, the citizens of Chapel Hill are all in this together – so as we develop small area plans for Ephesus Church Rd. or development agreements for Glen Lennox or revisions in zoning for Obey’s Creek, these efforts must mesh with the new set of planning tools and approaches called for by the Planning Board and former members of the SCVTF.

Parking Confusion

Once again an item with significant budget implications appeared on the consent agenda. This evening’s dealt with buying 40 more pay stations to finish covering Downtown’s on-street spots and increasing the cost of parking %25 to $1.25 an hour.

The discussion has been rather disturbing because two efforts have been conflated: the staff led Downtown Parking study which was done with a consultancy and the efforts of the Downtown Parking Task Force (which I and Councilmember Jim Ward were members of).

The Task Force most certainly did not recommend raising rates, as the Town Manager, Finance head and Downtown Partnership director suggested, while the study and staff led effort did.

The other confusion was the duration the meters run. The Mayor thought they had been shortened Downtown when they actually have been extended to 8pm.

The memo (here) was also light on the same kind of analysis the Downtown Parking Task Force did.

For instance, while suggesting that higher on-street costs will drive parking to cheaper off-street locations, there was no supporting analysis of that contention. The DPTF reviewed studies that show that increased rates can be effective in encouraging off-street utilization in highly urban environments (like Downtown San Francisco!). It appears that a more likely scenario for Downtown Chapel Hill would end up with driving some folks away while increasing off-street utilization during off-peak hours (can’t park in some lots at peak times).

A wash so to speak.

Considering that studies show underground lots have lower utilization rates than above-ground or ground-llevel lots, I’m not sure how the extra $70,000 in revenue is derived with the new Lot #5 moneypit mixed in. Unfortunately, that analysis was also missing.

Laurin Easthom did a good job trying to get behind the reasoning for increasing the rates now – including deferring the expected costs of dealing with Lot #5’s closure. Matt Cz. highlighted one of the recommendations of the DPTF, making parking fare free during the holidays and other periods of time when utilization is very low (think Christmas).

As far as the new meters, they are kind of neat but I’ve found their uptime a bit questionable (Chapel Hill Watch has a post on it here).

One positive of the units not emphasized by tonight’s presenters is that spaces tend to yield more revenue per space because folks can’t tell how much more time is on the meter so two parkers pay for the same space during the same time period twice.

Luckily the public will have an opportunity to weigh in again during budget season.

Parks Impact Fee: How Many (More) Goodies Do High Density Developers Need?

I spoke before Council this evening on the proposed changes to Section 5.5 (Recreation) of the Town’s Land Use Management Ordinances (LUMO). The changes, which were discussed over a decade ago, approved by the NC Legislature July 10, 2008, essentially amount to an impact fee paid by developers to support parks and recreation.

To quote, the impact fee “could provide a new funding source for Parks and Recreation capital improvements in situations where payments are made in lieu of providing recreation space on site.”

Unlike other development fees, the Planning Board, Parks Commission and Town staff worked to hammer out an assessment that roughly tracked the number of new users of parks and recreation services these new developments add to the overall system. Given that, you would think that a high density development adding 5 times as many folks as a R5 zone development would pay more.

Crazily enough, that isn’t the case.

If you develop a high impact, high density development you can look forward to paying 1/2 what other developers pay and, as a bonus, get the rest of Chapel Hill’s residents to underwrite new recreation services on your behalf. Inequitable – but then again Chapel Hill’s residents have taken on burdens – including subsidizing the West140 development at $10+ million in cash and $15-25+ million in property – for other recent projects.

Since much of Town is built out and the number of low density residential opportunities shrink, the only strong near term revenue source will come from new high density developments. With a number of such new developments/redevelopments in the pipeline you would think staff and the advisory boards would urge Council to move fast – to strike while the iron is hot so to speak. The reality? A provision to delay while all these projects work themselves out of the pipeline.

Just doesn’t seem fair to either Chapel Hill’s existing taxpayers or folks developing less dense options.

From tonight’s staff memo [PDF]:

The following chart illustrates the effect of the proposed change for high density residential projects. The first column shows the required Recreation Space for a residential development using the current system. The second column shows the Recreation Space that would be required if the applicant develops the maximum allowable floor area under the proposed floor area based system, but without a reduction. The following columns show various reductions by percentage. The highlighted column is the recommended 50% reduction.

Proposed Reduction High Density Development Recreation Impact Fee

Here’s the remarks I made this evening (as usual – I edit on the fly so they reflect what I meant to say):

A few of you might recall that I have asked Council to provide a family friendly park, pocket parks along with other amenities Downtown these last 6 years. With that in mind, I’ve been following and commenting on the evolution of the proposed ordinance since it was first suggested. While the overall framework looks solid, tonight I’d like to highlight a glaring problem with that ordinance.

Higher density development Downtown has been promoted by calls for the need for more residents Downtown. More residents means more demand for high quality recreational opportunities.

The higher cost of development also applies to creating suitable recreational opportunities for these folks within or near their high density residences Downtown and elsewhere.

The proposed ratio of residential recreation space for TC1-3, RSSC, MUV and OI districts has been reduced – as the Parks Commission memo states – because “this provision may be necessary in order to encourage high density development in appropriate areas and to address the higher costs related to building high density development.” Note, no supporting material for that contention is given.

This ordinance has been in the pipeline since 2008 and the parameters for calculating much higher in lieu payments discussed since early this year. That hasn’t stopped proposals – like tonight’s Courtyard redevelopment project – from coming forward.

The proposed %50 reduction in the required ratio means that the burden of providing these facilities is shifted off the shoulders of the developers who are profiting from this type development squarely onto the rest of us residents in Chapel Hill.

As we’ve seen from the new crop of high density developments – East54 and Greenbridge, for instance – the community has invested significantly in infrastructure upgrades . These projects were granted substantial and beneficial variances above and beyond those allowed by the underlying zones. In one case a new zone – TC3 – was created to make the project work. In other words, we – the Chapel Hill community – have already supported this type of development with greater height limits, floor area ratios, reduced setbacks, reduced buffer, etc.

At least Greenbridge stepped up and accepted, as a condition of their SUP, a required payment to support the Hargraves Center.

Now the community is being asked to subsidize recreational opportunities for these high density developers who have already received the community’s largesse.

What do we know then? We know that there has been no evidence provided that supports the contention that having high density developers pay their fair share will impede the submission or approval of these type projects.

We know that reducing the required ratio will shift the cost of providing quality recreational opportunities onto the shoulders of the folks living outside these projects. This includes folks that have been waiting years, sometimes decades, for key unmet improvements they have already paid for with their taxes.

With projects like the University Square redevelopment, Courtyard and Obeys Creek, we know that delaying the implementation of this ordinance means with there is a good chance the best opportunities for developers to share the cost of providing public recreational facilities for the residents of their projects and nearby neighborhoods will be missed.

Please rethink the reductions in the high density requirements in light of the costs, the opportunities on the horizon and a common matter of fairness to the rest of Chapel Hill’s taxpaying public.

140West: RAM Development’s Money Tree, Chapel Hill Taxpayers Moneypit

Local commentator and involved citizen Fred Black invited me to do a WCHL1360 Who’s Talking segment last week.

It airs this evening (Tues. Aug. 3rd, 2010) at 6PM.

While the subject was supposed to be the Lot #5/140 West project, which is slated to finally get started later this month, Fred used this opportunity to talk about development Downtown, public engagement, and Council.

As I said then and before, I believe Lot #5 presented an excellent opportunity for redevelopment.

I and others argued for a fiscally prudent, environmentally sustainable, community-oriented development that had workforce housing, affordable commercial opportunities, an integrative tenant – like a grocery store – and real public space.

Instead of getting a signature development that met those goals from the RAM Development/Chapel Hill collaboration we got a $10M+ taxpayer funded luxury condo development with little public utility. Architecturally, the project’s look fits the Atlanta beltway more than Chapel Hill – it says little, if anything, significant about our community.

Not only was the business model flawed but so was the underlying commitment to adhere to measurable energy and environmental targets (the Council, unlike what they’ve pushed UNC to do, did not adopt and has no plan to evaluate energy usage, for instance, using ASHRAE or other quantifiable standards).

Of course, I thought that the scale of this development (which you can get a sense of from the site models I created 4 years ago) didn’t fit the human-scale dimensions of our current Downtown. That human-scale is part of Chapel Hill’s ‘brand’ – evidenced by the Town’s own logo – and shouldn’t have been casually tossed without at least a proper attempt to educate our residents and some informed buy-in from the community.

What now?

The Council had many chances to walk away from the project over the last few years as RAM Development missed contractual obligation after obligation. The majority didn’t.

The Council had 2 years to work with local businesses to minimize the impact of the next 2 years of construction. That collaboration just started and already there is some significant friction between the Town and the Franklin St. commercial district.

The public financial burden begins immediately as the environmental remediation begins though the Town’s finances are stretched to the maximum by the majority of this Council’s decision to issue $20+ M in bonds for the Library expansion among others capital improvements. There’s no plan in place to publish those costs as they mount.

Is it too late to do anything? No.

This is OUR project. WE are investing $30-40M in cash and property and have every right to expect that nearby businesses can still function, that questions of public access be finally laid to rest, that every dollar invested by our residents is accounted for and that we have a solid commitment to measuring the success or failure – in terms of tax and parking revenues, energy efficiency, growth of commercial activity – of the project

I did a quick review of my posts on the Lot $5/140 West project and have collected those from 2006 to 2010 below for further background:
Continue reading 140West: RAM Development’s Money Tree, Chapel Hill Taxpayers Moneypit

Sustainability Task Force: The Whole or The Sum of the Parts?

As some readers might recall, I was appointed to serve on Chapel Hill’s Sustainable Community Visioning Task Force early last year.

Before we got started there were a few issues to address involving recruitment of a diverse membership to reflect both the concerns of the business community and the community as a whole. After settling on over 20 members, we began to work on a fairly ambitious task – to create a framework for making reasonable decisions on beneficial growth over the next 10 years.

The last few months the SCVTF worked diligently to create a set of principles that will inform our final work product. In the last few weeks, though, concerns about how to address issues raised as long ago as last Spring, once again surfaced.

Four members, Amy Ryan, Del Snow, Madeline Jefferson and myself, submitted the following letter to the committee as a whole this evening outlining not only our concerns but some proposals to more effectively, efficiently and energetically move forward with the task at hand.

Kudos to Amy for doing a fantastic job of word-smithing:

March 8, 2010

Members of the Sustainable Community Visioning Task Force,

When the task force was convened last summer, we were united in one thing: our willingness to commit a significant amount of time and energy to the task of ensuring that the future development of Chapel Hill would proceed in a positive and equitable manner. We all see the importance of providing citizen guidance to town staff, review boards, and local developers for managing the successful growth of our town.

As was made evident at the last meeting, there is a group of task force members who are concerned with the direction our work has taken and feel that our mission is being compromised. We would therefore like to take this opportunity to state our concerns in detail and propose an alternative to the process currently under way.

Our concerns with the current process fall into four specific areas:

1. No opportunity to look at the big picture

By focusing first on individual key areas in town that are likely to develop, we will not be looking at the town as a whole, as we were charged to do, and will not be able to see the cumulative impacts of our recommendations.

Unless we spend many meetings looking at every key area (which the task force seems disinclined to do) and then assessing the cumulative impact of all of them together, under the current plan we will have no way of determining whether our recommendations are reasonable, equitable, or practical for the town as a whole.

2.No specificity

The current Comprehensive Plan does an admirable job of providing general guidance for the development of Chapel Hill, but many of its provisions and recommendations are vague enough that they can be used to justify a broad range of development options, some less desirable than others. The task force’s set of guiding principles, while useful as a general statement of our vision, do not make any progress toward offering more specific, concrete guidelines for the town and local developers.

We agree that it is not the SCVTF’s job to create detailed small area plans, nor do we feel that such exercises are a particularly effective way of guiding real world development. Rather, beginning with the principles’ general vision for the town’s development, it should be the task force’s goal to provide leadership in guiding the town to begin developing specific, context-based guidelines for future development.

3.No acknowledgment of constraints

As the process is currently constituted, there is no mechanism for the task force to acknowledge and plan for factors that will limit the town’s development. The school district has confirmed that we are running out of sites in town for building new schools; the resources of our local watershed are finite; we can add only so many more cars to current roads before quality of life deteriorates; like all communities we have a responsibility to work toward sustainable resource use.

Phil’s “Where Do We Go from Here” memo of 3/9/10 (PDF) states that our charge is “recommending what kinds of growth and where growth can occur if it does occur, not whether growth should occur, or how much or how little.” While none of us are in a position to predict the future, we also can offer no meaningful guidance to growth without accepting and working with at least some general parameters of how much growth is expected, responsible, and desirable. We were charged by Mayor Foy to “challenge all assumptions,” not to work without any assumptions whatsoever.

4. No plan for iterative community input

In our discussions at the beginning of our tenure, the group was strongly in favor of obtaining community input that would provide feedback on our work along the way.

Until Phil’s 3/9 memo, the task force had not been informed of any plans for eliciting community opinion on our recommendations before our report goes to council. If the goal of a May report to council still holds, we question whether there is time for steps 3 and 4 of Phil’s plan to be implemented and incorporated into our report.

For our work to succeed, it must be “owned” not just by us, but by the community as a whole. Adequate time for public input on the guiding principles, hierarchy of trade-offs, and vision for all key development areas is crucial to making this happen.

Given these concerns, we would like to propose modifications to the plan of the task force’s work as we carry forward:

1. Spend one or two meetings on a Reality Check exercise

Given high and low estimates of population changes anticipated in Chapel Hill, along with accepted formulas for calculating expected demand for schools, commercial space, water, etc., it should be possible to form rough estimates of how many square feet of new residential, commercial, and civic space the town will require and can support. The task force could then spend one meeting in small groups deciding how this growth could be logically allocated throughout town; another meeting would allow reconciliation of the groups’ visions into a single task force plan, which town staff could review for conflicts or other problems.

This step would allow us to address big picture issues while avoiding hours of extra meting time looking at each small area in detail in order to build a picture of the cumulative development effects. It would also allow us to work within our development “budget,” accommodating constraints and planning for the town’s future needs. The resulting map would also provide a clear object for testing against the task force’s guiding principles.

2.Conduct character-based small-area development studies of one or two key neighborhoods

Using the information obtained from the Reality Check exercise, the task force could take the development allocated to one or two specific areas and take a close look at how best it could be accommodated.

The product of such a study would be a clear statement of the current neighborhood character, identification of opportunities for development and important elements to preserve, guidance for reconciling expected conflicts and making trade-offs, and specific examples for developers and town staff and boards on what kind of development would be appropriate.

Ideally, this exercise would be a quick example of a more in-depth process that the town would ultimately conduct in each neighborhood in town where significant development is likely to occur.

3.Plan for community input

It is vital to provide enough time for citizens to review and comment on the task force’s work as it progresses. Key elements for review would include (1) our refined list of guiding principles (after we have tested them in one or two small areas); (2) our map showing general allocation of development across the town from the Reality Check exercise; and (3) our recommendations for the select key areas we study.

When the town moved forward to develop in-depth neighborhood plans, it would obviously be crucial to get citizen input about how they see the neighborhood, what is lacking, what development works, and what doesn’t. This information would be the basis for the work of whatever group was charged with carrying this work forward.

While all members of the SCVTF may not have the exact same vision for Chapel Hill, we are united in our concern for the town and its future. It is time for us to be united in framing and agreeing to the process that will carry us forward. At the end of our tenure, we should all agree that we have produced a product that will identify the principles we hold in common, help us preserve what we value and improve what is falling short, and provide useful guidance for the town as it grows and develops. The process we have outlined above can be accomplished efficiently, will produce more useful guidance for the town, and will provide the basis for developing the specific development vision and guidelines the town so urgently needs.

Signed,

Amy Ryan
Del Snow
Madeline Jefferson
Will Raymond

cc: Garrett Davis
Phil Boyle
Mayor Kleinschmidt
SCVTF mailing list

WCHL Commentary: Library Expansion Next Year or Lot #5 Project, Not Both

Ron Stutts and WCHL 1360 invited me to do a commentary on a Chapel Hill issue.

I chose to speak out on the fiscally imprudent idea that we can “have our cake and eat it too”.

Run this and the following four year’s budget numbers, look at anticipated impacts – funding Town retirees’ health-care, fixing Police Headquarters, meeting our clean water responsibilities under the Lake Jordan compact, the doubling in demand on our social services, etc. – and it becomes clear – we can walk away now from the discretionary Lot #5 project – at little additional cost to the taxpayer – or do the Library expansion next year.

We can’t do both.

Thanks to Ron and crew for somehow squeezing 10 pounds of commentary [MP3] into a 5 pound bag. Amazing!

Jan. 25th the Council considered two projects with major financial impacts – the Library expansion and the problematic Lot #5 private/public development project.

After discussing their options at length, they decided to postpone approval of the Library expansion pending a more thorough review of the Town’s spending priorities during the Town’s normal budget process which, by the way, kicks off Wednesday, Feb. 3rd.

This was a reasonable and prudent course of action given the serious fiscal condition of the Town, the weakened economy, continued expectations of poor revenues and Council’s touted commitment to public participation.

Unfortunately, the Lot #5 project didn’t get the same level of concern.

The Town’s debt has doubled to $55M over the last 5 years. It’s been used to fund necessary and discretionary capital improvements like the construction of the new Aquatics Center – which at about $7M was almost on budget – and the Town Operations Center – which at $52M went roughly $10M over-budget.

Supporters claim the typical household will ONLY pay $40 more a year but that $40 only covers the increased cost of operating the Library and not the cost of discharging the $16M bond debt.

The Town Manager says that as we payoff existing obligations we can issue new bonds without increasing taxes. This might be true through 2011, but as the Town’s finance director pointed out, from 2012 on the construction debt pushes our overall debt very close – maybe even exceeding – the level necessary to keep our Town’s AAA bond rating.

At that point a tax increase is certain.

The Town Manager’s analysis is also rather one dimensional – challenges like the Town’s rapidly growing unfunded retirement obligations – projected to be as much as $56M or replacing Police headquarters – $10M if Council had purchased Dawson Hall – were not considered.

So what about Lot #5? Lot #5 requires 8 to 12M taxpayer dollars and represents the Town’s greatest, riskiest discretionary fiscal liability.

Part of the sales pitch for Lot #5 was the supposed need to stimulate development Downtown.

With Greenbridge nearly built and other Downtown projects on the way it’s clear that we didn’t need a stimulus. In fact, directly across Franklin St. the University at University Square is already putting forward a much more interesting, integrative proposal which better fulfills the goals of the Lot #5 project – and at little cost or risk to our taxpayers.

Given that the cost reductions that allowed RAM Development to lower their gold-plated condo prices haven’t been passed on to the taxpayer, that the number of pre-sold units hasn’t grown in-line with those price reductions, and that the Town still doesn’t know how it plans to borrow that $8 to 12M – now is the time to drop Lot #5.

Three years out – three contract extensions granted – no significant improvement in proposal.

What does this have to do with the Library?

We can have a Library expansion – hopefully starting next year – or we can have Lot #5 – we can’t handle both.

Contact Council – ask them to pull the plug on the Lot #5 project now so that we can take on projects that are more central to Council’s charter.

More information on my website, CitizenWill.org.

Library or Bust? Laurin Easthom’s Concerns

The Council decided to postpone the Library expansion decision pending further data and discussion.

Council member Laurin Easthom pointed out on Monday, once again, “We need to make some real serious decisions about citizens who use our library and don’t pay.” Laurin has been on-top of this issue for some time. She has also been quite clear in her concerns (THE LIBRARY AND THE FREE LUNCH) unlike several of her colleagues.

Laurin is not alone.

Her colleague Penny Rich added “Citizens in Chapel Hill are quite generous, but I think the endless supply of money in our wallets is not there anymore.” (Daily Tar Heel, Jan. 26th, 2010).

New member Gene Pease, who has been a stalwart supporter of the library for many years – raising significant funds as a member and leader of the Friends of the Library president of the Chapel Hill Public Library Foundation [thanks Fred!] to support its mission – said “To have no conversation about this and about how to attack this problem in the operating budget, I think it’s irresponsible to make the decision tonight” (Lauren Hills,NBC17) in justifying the delay.

I’ve watched this issue unfold for several years, called on former Council’s to show some fiscal restraint over the last 4 years so we could accommodate this project. It is clear that given the current economy, a prudent assessment of our Town’s revenue stream, the core fiscal liabilities and obligations we must discharge (which does not include that Lot #5 money pit), the Library expansion must wait.

Of course, that’s my considered opinion which is based on the data at hand, my entrepreneurial experience and a financial philosophy that emphasizes “living within our means”.

Laurin Easthom foresaw these same issues and tried to set several plans in motion to address this unfortunate juncture – the public’s growing desire for a new facility coupled with a bare public cupboard.

Last April, in fact, she directed the Town Manager and staff to come up “with a financial cost sharing plan” to help ameliorate the anticipated rise in operational costs. To date, no plan has emerged from Town Manager Roger Stancil and crew.

A quasi-plan did emerge on Monday from new Mayor Mark Kleinschmidt and Jim Ward – pressure the Orange County Board of Commissioners and, as Jim put it, make adequate library funding a “litmus test the winners are going to pass, period.” in this year’s county-level election cycle.

Given the County budget mess, the incredible pressure to fund the schools, existing debt obligations, new costs and lost revenues, threats are a non-starter. And, as Jim and Mark seemed to have forgotten, when the county commissioners (BOCC) pushed through election districts, Chapel Hill citizen’s leverage was somewhat diluted.

Our leadership must work with the BOCC on adequately funding the library using a more positive approach. Sure, we shouldn’t continue to accept “nice words that … are worth zero” as Jim Ward said of the Commissioners (Greg Childress, Herald-Sun, 01/26/10) but we also can’t expect to get blood from a turnip.

The best approach, I believe, is to jointly identify sources of funds, possible cost savings made possible by collaborating on other issues, to find the money we need for operating the facility.

That said, “absorbing” additional debt alone should push the start date of the expansion off until next year.

The Town Manager is recommending that as the Town retires existing debt we take on new debt by issuing the Library bonds. That might be a sensible approach if our Town wasn’t already burdened by an incredible debt load – historically unprecedented – during such a troubled economic time. The Town needs to retire existing debt, bring our reserves back up and take a small breather before launching into another spending spree.