At 1460 hits, this video is by and far the most popular one I’ve posted on youTube. No surprise to me as Tracey did an incredibly eloquent presentation on the flawed Solid Waste Advisory Board’s search for a new trash transfer site.
Category Archives: Downtown
Election 2007: League Of Women Voters Forum
A big thank you to the local chapter of the League of Women Voters for an excellent forum this evening. Vicki Boyer, who occasionally posts on OrangePolitics kept the show moving along with a variety of audience questions.
Unlike the Sierra Club forum, the environmental and social justice issues surrounding our neighbors out on Rogers Road (of which I have spoken about numerous times) got a fairly decent airing. The $8 million Downtown Development boondoggle merited one round.
The forum’s format, a round of answers with some opportunity for give-and-take, suited tonight’s questions. I hope the public and the local media take some time to mull over our responses.
There were a few surprises from the non-incumbents: Kevin Wolff bringing up voter-owned elections, Penny Rich suggesting punishing Downtown landlords who wouldn’t fill their storefronts, Matt Czajkowski’s excellent point that Chapel Hill has become introverted.
Of course, the incumbents tried to take credit for all the successes over the last four years while trying to dodge any responsibility or account for any of the mistakes.
Some of the successes – hiring an economic development officer, developing a strategic economic development plan, the Town’s new fiber network – were issues I brought forward first.
As far as surprises from the incumbents, I appreciated Mayor Foy’s complementary observation that I have an eye for efficiency.
Jim Ward’s bit of criticism (Incumbency Is Not Enough or Nineteen Seconds Is Too Long) about the 19 seconds I went over my time on one response provided some humor.
And Cam Hill, one of the negotiators on Lot #5, quoting a citizen outlay about $1 million short of the actual figure (CHN). I’ve been up since 6am and can understand a fumble –
hope fatigue explains his sloppy accounting.
The League graciously allowed me to assist them in posting tonight’s video on the web.
I’m preparing for upload now and expect the full video to be available by tomorrow evening (I’ll post a new article when it’s done).
Oh, and the Sierra Club has since declined my offer to post their forum on the Internet. They plan to do it themselves. I’ll keep an eye on their progress and will announce its availability.
Visions of Avalon
Last night there was an unfortunate and possibly gang-related incident at Rosemary Street’s Visions nightclub.
At approximately 1:00 a.m. this morning officers responded to a report of gun shots at Visions Night Club located at 136 E. Rosemary Street. Multiple shots were reportedly fired from a handgun by an unidentified black male suspect after a fight occurred inside. Six victims were treated for non-life threatening gunshot wounds at area hospitals. Some of the victims identified have known gang affiliations. Due to the low lighting and the confusion associated with the large crowd, the suspect exited the night club shortly after firing the shots.
Lt. Kevin Gunter, CHPD
I was relieved to hear no one suffered grave injury.
I was also struck by the timing – it was just one year ago that then Police Chief Jarvies issued this memo [PDF] enumerating the reasons for closing Avalon, a similar venue on Rosemary St. I work close to Avalon and saw the escalation of minor problems into what became the culminating event leading to its closure – the July 30th, 2006 fatal shooting of Kevdrian Swan.
This was not the first incident at Avalon or, as Chief Jarvies noted, 136 East Rosemary St., the then location of Player’s, the current location of Visions.
My first thought was: “What should we have learned from the Avalon mess? Why didn’t our Town do more to prevent another outbreak of violence?”
Chief Jarvies pointed out the Players had the second highest incidence of serious offenses. The plan was to meet with the owners of that club and try to prevent another Avalon type outcome.
Why, a year later, are we dealing at the same location with what could have been a worse tragedy? Couldn’t the Town intervene earlier? Why didn’t it?
Both citizens and the media report that problems – including violent behavior – had been escalating at Visions (and spilling over into the nearby neighborhoods). The pattern was established but the Town failed to act.
As a University town, night clubs are a act of life. The Town should be able to foresee, especially with the growing influence of gangs in the Triangle, that venues like Visions can attract a dangerous crowd. Why don’t we have a standard mechanism for working with club owners to forestall these issues? Why aren’t we monitoring these flash points?
As far as Visions, I’d like to hear more about the incident. The knee-jerk response is to call for its closure – to go into reactive mode – something our Council is quite adept at.
Since we apparently missed an opportunity to learn some lessons from Avalon, I’m asking Council to make an effort to learn from Visions. If these venues are going to be allowed to operate, we should damn well be proactive and be ready to clamp down when we see a pattern of problems developing.
I’ve supported the CHPD’s efforts to become more “gang savvy” (here’s what I said about funding on WCHL).
I called on Council to provide a little “helper” funding to help make the recent Governor’s Crime Commission grant a bit more effective (didn’t happen).
Whether I’m elected or not, I will be asking Council again to support adequate gang education for both our police force and our community. And, as I said one year ago, we need to do more than deploy officers Downtown. We need to re-balance our force to nip issues before they escalate.
That is why I’m encouraged by an objective our Town Manager set our new new police chief, Chief Curran, to “expand the community policing efforts of the department so that community policing becomes a belief system within our department”.
Finally, Office Gunter asks:
Anyone with information about the shooting, please call either the Chapel Hill Police Department at 968-2760 or Crime Stoppers at 942-7515. Calls to Crime Stoppers are confidential and anonymous, and the caller may be eligible for a cash reward up to $1,200 for information that leads to arrest.
Forewarned, supposedly, is forearmed. We obviously missed a few lessons from the Avalon mess, hopefully we won’t miss the lessons of Visions.
Hail to Our New Chief: Brian Curran Takes the Helm
[UPDATE:] Not 15 minutes went by before I got the chance to congratulate Chief Curran in person. He was making his rounds through the Northside neighborhood (I noticed him rolling around Town before – he doesn’t seem to be much of a desk jockey).
[ORIGINAL]
I’ve had an opportunity to meet Brian in a few different venues these last few months and my initial impression that he was a talented officer capable of leading our department through transitional times has only been strengthened.
When he was initially appointed to take Chief Jarvies position I did a little research and was impressed by the commitment he has shown our Town.
When Town Manager Roger Stancil cast a wide net seeking a new Chief, I was hoping that our own law enforcement folks would be considered fully. With the failure to secure Roger’s first choice (due to the candidate’s failure to pass a health exam), I was looking forward to a re-evaluation of our home team bench.
Today Roger announced the permanent appointment of Brian to Chief.
Concurrently, Roger set some specific goals that will keep Brian busy over the next couple years.
To: Mayor and Town Council
From: Roger L. Stancil, Town Manager
CC: Senior Management TeamDate: September 24, 2007
Subject: Appointment of Brian Curran as Police Chief
I am proud to appoint Brian Curran as the Chief of Police of the Town of Chapel Hill. This appointment is effective immediately.
Since April 1, 2006, when Chief Gregg Jarvies retired, Brian Curran has served as our Interim Chief. During that time, he has exhibited the qualities that our community said they wanted in a chief during a series of community focus groups. As I made my decision, I reviewed the notes of those focus groups carefully. The words they used describe the behaviors and characteristics I have seen in Brian: Fair, honest, well-rounded law enforcement experience, understanding Chapel Hill, experience with University relations, understanding of neighborhood needs and concerns, leads by example, decisive, team player, experience with managing large gatherings of people, ability to relate to everyone in the community, good manager, approachable.
Having seen those behaviors, I have decided Brian is the best person to lead our Police Department and become a part of the Town’s Senior Management Team as we work collaboratively to make Chapel Hill an even better place to live.
Brian has worked for the Town of Chapel Hill since 1982. He began work in the Parks and Recreation department. He then served as a non-sworn communications specialist with the Police Department before becoming a Public Safety Officer in 1987. He has served in various roles in the department that give him a broad view and an understanding of the department and the community. I have attached his resume for your information.
The process.
As stated above, I carefully reviewed the characteristics of a chief of police as stated by the various community, employee, management team and Town Council focus groups earlier this year. I also reviewed the matrix of leadership characteristics that evolved from those focus groups. I reviewed the remaining finalists in the original round of applications as well as the applications received since we readvertised the position in July. I assessed the behavior of Chief Curran since he became interim chief in April. I asked the interview panel from our assessment center, supplemented by other assessors, to interview him and provide feedback. Based on the behavior I observed in his interim role and the feedback from the interview panel, I determined that Brian has demonstrated the characteristics sought by our community and is the best person to lead our police department.
The charge.
I have charged Brian with the following goals:
- Assess the department, involving our employees and the community to tell us what we are doing well and where we have opportunities for improvement.
- Create a leadership development program for our officers and our non-sworn employees to develop our future leaders internally.
- Take positive steps to create a diverse command and supervisory structure that represents the various cultural faces of Chapel Hill.
- Expand the community policing efforts of the department so that community policing becomes a belief system within our department.
- Take the lead in innovation and teamwork to find solutions to community issues.
I look forward to working with Chief Curran.
As so do I, Roger. I especially like the goals Roger has set our new chief. Community policing needs to be a reflexive ethic of our department. Developing AND RETAINING our young turks will serve the Town well over the next few decades. And working to encompass the diversity of our community should make our law enforcement officers task smoother.
Congratulations Chief Curran.
Election 2007: Sierra Club Interview
X-Posted from Will Raymond for Town Council 2007:
The local Orange-Chatham Sierra Club participates in the local election process two ways: endorsing candidates and sponsoring a forum.
Last Sunday, Chairman Bernadette Pelissier, Political Chair Loren Hintz and member Matthew Scheer interviewed me on behalf of the Sierra Club to determine if I qualified for an endorsement.
Questions spanned local zoning policy, a discussion of good and bad infill, personal commitment to environmental protection and Carolina North.
Folks that read CitizenWill already have a good idea about where I stand on many of these issues.
Surprisingly some issues, like local waste management, the trash transfer station and Rogers Road community’s complaints, our storm water utility policy or in-town open space preservation didn’t make the list. Of course, you can only fit so much into a 45 minute interview.
I appreciate these members taking the time to review my thoughts on Carolina North, zoning policy, pragmatic carbon reduction strategies, transit, etc. (I tried to cram way too much into my answers and digressions).
The Chapel Hill forum takes place next Tuesday, September 25th, 7-9pm at the Chapel Hill Town Hall. The event will be broadcast on our local public access channel.
In 2005 I did secure the local club’s enthusiastic endorsement. Here’s what they said two years ago:
Will Raymond has been one of the most outspoken and effective citizen activists in Chapel Hill in recent years. We look forward to him using his talents to advocate for the environment as a member of Town Council. In particular we are excited about his initiatives to promote energy efficiency in town buildings. He will also work to protect lesser known creeks in the Chapel Hill area and to minimize the number of single occupancy vehicles causing air pollution and traffic congestion at Carolina North.
We strongly encourage Sierra Club members and any residents of Chapel Hill who care about the environment to support these four candidates in the November 8th election. They are the best hope for a Town Council that will always make reducing environmental impact a top priority as Chapel Hill grows bigger.
We’ll know by mid-October if the work I’ve done since – on Carolina North, as a member of the Horace-William’s Citizen Committee sub-committee on environment, tracking and publicizing the landfill/transfer site problems on Rogers Road – will secure an endorsement in 2007.
Election 2007: The Chamber’s Yes, No and Unsure Questionnaire
X-Posted from my 2007 Campaign web site.
Even though the Chamber made it clear that extended replies where not welcomed in the 2007 questionnaire ( Election 2007: The Chamber’s Yes, No, Unsure – Again!), I took the opportunity to answer each of their questions beyond the constraints of “yes, no, unsure”.
The questions are broad, open to interpretation and, on occasion, leading. How would you answer the Chamber’s questions?
In case the Director omits my business background, as he did in 2005, I worked for Northern Telecom for many years, winning a couple President’s Awards and a Chairman’s Award for Innovation (the first IT person to do so). I have been a CIO/CTO of a couple successful startups, including Reged.com which sold to FiServ for millions. As an entrepreneur I was part of the crew that guided those companies to multi-million dollar revenues. I currently work for Tibco, an enterprise application integration company, specializing in XML technology and distributed Java application architectures.
Here is the questionnaire and my extended answers. You’ll note I wasn’t unsure at all:
4. Is increasing the commercial tax base in Chapel Hill an important priority for you?
YES
Even before my run for office in 2005 I was agitating for a Economic Development Officer to help develop strategic and tactical approaches to increasing our commercial tax base. Council finally hired an officer, now we need leadership with business acumen to make the best use of his services.
Continue reading Election 2007: The Chamber’s Yes, No and Unsure Questionnaire
Carrot or Stick: House Approves Chapel Hill’s Energy Reduction Incentives
Via Council member Mark Kleinschmidt’s ‘blog, it appears we’re well on the way to Chapel Hill getting a carrot to entice developers to adhere to better environmental standards.
The new law :
“Sec. 5.19. Ordinances permitting density bonuses and other land‑use development incentives for development projects agreeing to meet energy conservation carbon reduction standards.
For the purpose of reducing the amount of energy consumption by new development, and thereby promoting the public health, safety, and welfare, the Town of Chapel Hill may grant a density bonus, make adjustments to otherwise applicable development requirements, or provide other incentives to a developer within the Town and its extraterritorial planning jurisdiction if the developer agrees to construct new development or reconstruct existing development in a manner that the Town determines, based on generally recognized standards established for such purposes, makes a significant contribution to the reduction of energy consumption.“
When Council first proposed this quid pro quo type approach I was excited.
Sure, smart developers would already be pursuing state-of-the-art strategies to lessen energy consumption. Savvy business folks recognize that reducing the energy footprint of a building is now a key market differentiator – that many environmentally-sound design practices actually are inexpensive. Nothing like building a premium into ones property with no negligible impact on the bottom line.
For those developers not quite as sold on the economic and ecological benefits, Chapel Hill would have this new carrot.
My excitement, though, has been tempered by recent history. With poor Council leadership, this law could allow for greater abuses in land management. Look how Strom and company forced through a new planning zone – TC-3 – allowing more than double the density and %33 more height in the Downtown area. They used Greenbridge, a development adhering to the highest environmental standards, as cover for their sleight-of-hand approval of a new policy that, I believe, many in Chapel Hill would not agree with.
In the hands of the “rah rah” growth crowd,this energy miser ordinance could be used as a bludgeon to hammer our Town into rough conformity with their “density at any cost” vision.
To protect against abuse, it is key that a mechanism be created to adopt the highest objective standards for measuring energy reductions and to design in future flexibility for adopting other “best in class” metrics to keep our local ordinance “evergreen”.
Further, there should be NO in lieu provision (something which has been greatly abused in the affordable housing arena). A developer either adheres to these objective standards to get their “carrot” of increased density or not get a variance.
Without these additional provisions, we’re facing the great possibility of more poor public policy “greenwashed” and cloaked in the rhetoric of environmental remediation.
Hazardous Consequences: Mystery of the Vault Contest
[CLARIFICATION]
Everyone gets two (2) guesses – their “real” guess and an outlandish assessment (please, keep it clean. Yes, skeletons are welcomed).
[UPDATE:]
Over on SqueezeThePulp former (and soon to be?) Carrboro Board of Alderman candidate, Orange County Democrat Women President, local businessperson and activist Katrina Ryan has offered a delicious La Rez meal for the grand prize winner and guest.
Thanks Katrina for stirring the pot!
[ORIGINAL:]
I’ve covered the devolving fortunes of our Town’s Downtown Development Initiative (DDI) since last Fall.
Throughout, I’ve referred to the Lot #5 development as an expensive boondoggle, a miserable mistake, poor public policy, a looming Behometh, a monument to the triumph of political ego over the public good.
I’ve also called it a potentially vast money pit.
Our elected folks might argue with most of my characterizations but not, it appears, my claim that Lot #5 is a money pit.
According to the recent environmental assay, Lot #5 contains
An unknown feature located at position A was identified as a potential metal vault approximately 8ft by 10 in area.
Former Councilmember, NC legislative bill drafter and longtime Chapel Hill observer Gerry Cohen speculates on the vaults contents:
I’m going to assume that Ross Norwood abandoned the vault when his lease was terminated around 1970 and he was kicked off the site. I will offer advance speculation that it is filled with cash. I’m being serious about this. I think I posted earlier about the swindle with his dollar bill machines, and there was a post in another thread on OP from a former employee at Ross Norwood Esso about “questionable ethicsâ€.
Like Geraldo Rivera’s Al Capone’s mystery vault stunt, the over-hyped Lot #5 project is already fated to disappoint.
Whether the vault exists, has cash in it or not, I thought the mystery was worth some speculative fun and a community reward.
To that end, I’m sponsoring a contest to reward two local community organizations with cash donations.
Post a comment on this thread detailing your ideas about:
- the most outlandish, Chapel Hill related, treasure this vault might contain (Dean Smith’s bronzed baby shoes?) and
- the most accurate description you can summon on the vaults contents (a $100,000 in singles as per Gerry) or what “the vault” might actually be (Jerry Garcia’s missing VW Bus?)
Rules:
- Please keep entries clean and “family friendly”.
- Winners will be selected based on accuracy and creativity.
- I will contribute $150 to each winning person’s local charity/organization of choice.
- Though the awards will stay within our local community, local residency is not required.
- Sorry, no one working for the construction or excavation firms can participate.
- Contest closes one hour before the vault is revealed.
- Finally, while I’ll be the sole judge on both criteria, please feel free to influence the outcome by voting for what you think is the most outlandish, creative idea.
So, some good – and a bit of socially redeeming revenue – will come from building on Lot #5.
I invite other organizations more PR savvy (Liz, maybe the Downtown Partnership?) to build an “event” around this vaults unveiling – it might be the most “rewarding” aspect of this project for years to come.
Hazardous Consequences: A Report, a Rushed Decision, a Regrettable Day for Chapel Hill
The Chapel Hill News’ ‘blog OrangeChat first alerted me to the Town’s completion of the Lot #5 negotiations with RAM Development (more to come in the N&O).
The Town’s April 3rd news release celebrates what I believe will eventually be seen to be a rushed decision foisting a counter-productive, fiscally irresponsible obligation to construct expensive rental properties for out-of-town landlords on our citizen’s dime:
04/03/07 — The $75 million residential and retail complex to be constructed on Town-owned Parking Lot 5 in downtown Chapel Hill moves a step closer to reality. Town Manager Roger L. Stancil today concluded final negotiations and executed the development agreement with Ram Development Co.
April 3rd, 2007, a regrettable day in our Town’s history.
Why? According to our Town’s legal counsel, the only way now to back out of this troubled deal is to default. Default means difficult to defend lawsuits against our Town. Default means probable expensive judgments against our community. Default, after today, puts all our residents firmly on the hook for millions of dollars of expenditures.
The Council last month authorized the Manager to finalize negotiations and execute the agreement. The project will now follow the Town’s normal regulatory process for a Special Use Permit, including review by the Town’s advisory boards and commissions and a public hearing before the Council.
While they did authorize the Town Manager to proceed with negotiations, the Council also directed Roger Stancil to achieve certain goals – like a firm commitment to improve energy efficiency as per ASHRAE 90.1 20% efficiency standards and an increase on-site affordable housing parking.
Without the final modified agreement (not available this evening), it is not clear our Town Manager achieved these goals. Further, for the partial success reported – 5 additional on-site parking – the trade-offs required by RAM to get those spaces remains unknown.
Final negotiations centered on energy efficiency construction. Recognizing the importance of reducing the energy demand of buildings and dependence on energy from fossil fuels, the Council directed that the agreement require the design and construction of the project to meet a minimum 20 percent improvement in energy efficiency (as measured against standards established by the American Society of Heating, Refrigerating and Air-Conditioning Engineers – ASHRAE).
Again, the language of the announcement leaves it somewhat unclear, at least to me, if the commitment to the ASHRAE 90.1 %20 energy efficiency standard is measurably firm.
As part of the final contract, Ram agreed to achieve an energy efficiency level 20 percent better than standards established by the American Society of Heating, Refrigerating and Air-Conditioning Engineers.
It appears the LEEDs trade-off discussed here was the key to ASHRAE acceptance. Of course, without the final contract before us it’s difficult to ascertain how compliance with ASHRAE or LEEDs will be measured.
The project will incorporate sustainable, “green†features that will result in at least 26 points under Leadership in Environment and Energy Design (LEED) standards, the equivalent minimum number of points for basic certification under the LEED system. The Council has established a Town-wide goal to reduce carbon dioxide emissions by 60 percent by 2050 through the Carbon Reduction Program.
Councilmember Sally Greene suggested trading the potentially expensive formal LEEDs review for simple compliance with the LEEDs basic certification goals. Councilmember Jim Ward countered that RAM Development’s assertion of compliance was insufficient – that the review process was a necessary element to achieving those goals. I lean more towards Sally on this with the proviso that a specific, standards-based methodology for measuring compliance outside of the LEEDs process be agreed upon prior to a final commitment (would’ve been nice to also pursue some of the AIA’s 2030 sustainability goals). Again, sans the modified agreement, it’s unclear whether any process for measuring LEEDs compliance is in place.
To the Town’s credit, the environmental reports I asked for in my Mar. 27 petition were provided as part of the announcement.
The completed environmental assessment report will be on the Town’s website. The assessment detected no underground gasoline tanks, only limited sections of petroleum-impacted soil that will require remediation.
Timed too late for our talented citizens with expertise in geology and environmental remediation to influence Stancil’s decision, this coincident release demonstrates, once again, the ascendancy of clever political gamesmanship over good public policy.
This bit of Town PR vastly downplays the caveats and disclaimers the authors used:
The report’s findings are based on conditions that existed on the dates of ECS’s site visits and should not be relied upon to precisely represent conditions at any other time. ECS did not assess areas other than those discussed in the report.
The conclusions included in this report are based on: ECS’s observation of existing site conditions; our interpretation of site history and site usage information; and the results of a limited program of subsurface assessment, sample screening, and chemical testing. The concentration of contaminants ECS measured may not be representative of conditions between locations sampled. Be aware that conditions may change at any sampled or unsampled location as a function of time in response to natural conditions, chemical reactions, and/or other events.
Conclusions about site conditions under no circumstances comprise a warranty that conditions in all areas within the site and beneath structures are of the same quality as those sampled. Recognize, too, that contamination might exist in forms not indicated by the assessment ECS conducted.
Based on approximate measurements of the property boundary and sample locations, ECS estimates that approximately 8,600 cubic yards (~13,000 tons assuming 1.5 tons per cubic yard) of petroleum-impacted soil may be present at the site. This is a preliminary estimate only; the actual quantity of potentially impacted soils may vary based on conditions observed during soil excavation. [CW: EMPHASIS by ECS]
The concerns of the report’s authors are clear. What is left unsupported is the Town’s cost estimate.
The estimated cost of the clean-up will be $232,000. The Town will assume the costs for remediation, and the developer will fund the excavation.
So, RAM Development will pick up the tab for excavating 13,000 tons/8600 cubic yards of hazardous material and the Town will pay, I assume, to haul it safely off-site and dispose of it in an acceptable manner. Given the author’s caveats and the lack of discussion of hazardous material intrusions into the underlying bedrock, I’d like to see the analysis behind the $232,000 cost estimate.
Is it as solid as RAM Development’s Spring 2006 claim of a total $500,000 in public outlays? I hope not since a 15-fold increase in the environmental costs, similar to the 10 month increase from $500,000 to $7,425,000 for those 161 buried parking spaces, would be in the neighborhood of $3.5 million!
One notable improvement in our Town’s communications is a savvy ability to propagandize, making a gold-filled silk purse out of the hazardous waste sows ear by now trumpeting development on “brownfields”.
“Developing a project in downtown reflects Chapel Hill’s commitment to build on brownfields rather than greenfields in order to preserve our environment,†said Manager Roger L. Stancil. “Brownfields are properties where redevelopment or reuse can be complicated by the presence or potential presence of pollutants or contaminants from past use. Developing on greenfields is to build on undeveloped properties on the urban fringe, often farmland. Chapel Hill intends to keep the greenfields green.â€
A month ago we weren’t supposed to worry about hazardous waste on Lot #5. Today it’s an asset.
There’s a lot of fertile “brown” in the “fields” lay bare by this announcement. Once again, the liabilities are down-played, the potential fiscal “surprises” ignored, the value of the project over-stated while the obligations continue to be heaped upon our citizens.
April 3rd, 2007, a regrettable day in Chapel Hill’s history.
Hazardous Consequences: No Official Word, Yet, On Lot #5’s Hazardous Waste Issue
[UPDATE] As of April 3rd, the Town has provided part of what I asked for in the following petition, the environmental report [PDF]. In the Town’s announcement of a conclusion to negotiations, the figure of $232,000 for a remediation was thrown out. This figure, of which I haven’t found a full justification, would supposedly include removal of 13,000 tons of material to either a hazardous waste landfill or some other remediation facility.
More to come.
[ORIGINAL POST]
A quick follow up on my previous post Lot #5 Development: “…up through the ground come a bubbling crude…â€.
I’ve sent Chapel Hill’s Town Council a petition (Mar. 29th) asking for a postponement of any further approvals for Special Use Permits, extending or adding new consultancies, preparing the lot for construction, etc. until the financial liabilities attendant to environmental remediation are fully and timely disclosed.
Further, to avoid the recent mess involving the Rogers Road community, siting a trash transfer station on Eubanks and the Orange County Board of Commissioner’s apparent lack of any discernible specific, detailed and publicly revealed process for making their analysis and decision, that the methodology, data and assumptions are published by Council fully seven (7) business days prior to any approval.
A call from the Daily Tar Heel spurred me to take this action. I was hoping the environmental report, which, from my experience, should’ve taken a short time to prepare, would be published for public review by now. According to the DTH’s reporter, it hasn’t.
My concern is that the “clock” would be “run out” on the hazardous waste remediation issue – that Council would move ahead amassing further public (taxpayer) obligations without adequate background.
To help encourage a full, timely, open and responsible discussion of the hazardous waste issue, I’ve submitted the following petition:
Mayor and Town Council,
I’m petitioning Council to postpone ANY further approvals for the Lot #5 Downtown Development Initiative:
1) until the environmental assay of Lot #5 is 100% completed. This would include any recommended
follow up tests, such as monitoring wells, further core sampling, ground-radar location of
tanks or other structures, etc.2) until the results of the environmental assay have been independently reviewed.
3) until the results, the independent review, the methodology, data, assumptions, geologic maps
and any other factors used to derive the results have been published 7 days prior to the
approval meeting.4) until an initial estimate and plan for the environmental remediation, if necessary, has been
developed.5) until the estimate, the methodology, data and assumptions going into that cost estimate have
been published 7 business days prior to the approval meeting.6) until a financial impact statement, including additional costs, borrowings and wider effects
on the Town’s financial well-being has been developed.7) until the estimated financial impact and methodology, data and assumptions going into that
evaluation have been published 7 business days prior to the approval meeting.It also appears that the underlying geology of Lot #5 might be rockier than expected. If this is so,
Council should also postpone further approvals pending an evaluation of increased costs to the
developer and taxpayers of Chapel Hill.Considering that an expensive environmental remediation might significantly and adversely impact our
Town’s finances, and, in combination with Lot #5’s current taxpayer obligations, possibly necessitate
either a substantial tax increase or reduction in services or both, the fiscally prudent course of
action is to wait until the facts are reported and the conclusions reviewed by the wider public.Finally, I would like to highlight the importance of giving the public at least 7 business days of
notice. Our citizens are already concerned about the trajectory this project has so far taken.
Some of the greatest concern has come from financial, urban planning, environmental, energy and
commercial real-estate experts.Let’s give our talented citizenry the opportunity for a careful, measured evaluation of the
Town’s reports and extend the courtesy of providing a reasonable amount of time to draft a
response.Rushing the project forward without disclosing further anticipated financial obligations does
our citizenry a disservice.Thank you,
Will Raymond
I’ll post the response as it comes in.
Lot #5’s Silver Lining
At least I won’t have to see that anymore…
Local resident and business-owner not happy with the size and cost of the Lot #5 development but pleased what’s commonly considered the ugliest building downtown, the Bank of America plaza, will be blocked from view.
A Matter of Process: Greenbridge and Council’s Devolving Standard of Public Review
I haven’t been reticent in my criticism of the process Council used recently to manage the approvals for Greenbridge, the environmental uber-project and possible end of the traditional Northside neighborhood. Adopting a new zone, TC-3, developed and refined during the months bridging Thanksgiving to Christmas, within the context of Greenbridge’s approval ill-served our citizens.
Claims, most notably by Bill Strom, that Greenbridge’s TC-3 is somehow unique (video coming soon) and folks won’t have to worry about another use will be tested all too soon.
Most of the Council members are aware of the public discussion and scrutiny of the 90′ limit and 1.97 density ratio. Unfortunately, the minimal opportunity citizens had to respond within the public hearing process didn’t reflect those hard learned lessons. Only two citizens spent any of their 3 minutes of public comment suggesting the impropriety of making a major change to Downtown’s future geography within the narrow context of Greenbridge. Doubling the density, raising the height limits by %30, with the SUP establishing a height precedent fully %50 above the previous 90′ will carry serious consequences for “human scale” Chapel Hill. Now that door has been opened, does anyone truly believe developers on our doorstep will not press for even more consequential change?
I recall Sally Greene, prior to being elected to Council, making numerous appearances before Council on OI-4 (the most probable zone for Carolina North) counseling not only greater public outreach but public education. She argued process, process, process and was obviously aware that a significant change in public policy demands a significant effort to build understanding.
Yes, the effort to build understanding can also build opposition. One might argue that the best “political” strategy “playing the approval game” is to keep your head down, limit public understanding and bull on through. Good strategy for a “player”, maybe, but terrible public policy.
Tonight, the Chapel Hill News’ breaks the story, on their ‘blog OrangeChat, that the son of one of our Council members sought to represent the developer of Greenbridge.
Sometime last fall, the son of Town Council member Bill Thorpe approached the developers of the Greenbridge condominium towers and offered to work as their public relations consultant.
Thorpe said his son, William Thorpe Jr., is a grown man and did not consult him before making the pitch.
UPDATE:
From today’s followup in the N&O
Thorpe said his son, William Thorpe Jr., is a grown man and did not consult him before approaching the developers. Thorpe said he only heard rumors that his son had asked for a $40,000 consulting fee.
“He was trying to get a contract with them, but I haven’t done anything with them,” Thorpe Sr. said this week. “It had nothing to do with me.”
Yes, we’ve seen our share of national problems with relatives representing interests before their elective relations but certainly this doesn’t rise to that level. Bill spoke of his son during the 2005 election, I don’t recall his saying he did PR. In any case, Bill made it clear his involvement was nothing to be troubled by: “I ain’t got nothing to hide,” Thorpe said this week. “I can tell you right now, I have not asked anybody for no money.”
[UPDATE] GeorgeC over on OPsays the Mayor and Attorney reviewed this, not the Council, yet the article and post both say “Foy said the council did not pursue the matter further…” Now, was that the Mayor using the royal “We” or did the Council know? I’ll ask either the reporter or a Council member next time I see them. If this was the Mayor acting as the lone “decider”, well, that’s a bit troubling in itself.
[ORIGINAL]
The Mayor and Council, it appears, reviewed the issue on discovering it:
Mayor Kevin Foy learned of the situation before a public hearing on the downtown condo project Jan. 17 and asked Town Attorney Ralph Karpinos for advice.
Foy said the council did not pursue the matter further because Thorpe Sr. was not personally involved. Foy said he believed that his colleague’s hands were clean in the matter.
That January 17th meeting was a key public hearing for Greenbridge.
This is most troubling. I can accept Bill Thorpe’s assertions about his son’s involvement. I can appreciate Council and (?) the Mayor responding immediately with a legal consultation and review.
What I can’t understand, and will not accept, is the absence of public disclosure.
Yes, the appearance of impropriety can sting. Trying to mitigate the possible embarrassment and pain of a friend and colleague is laudable. But these are public servants. Many of these Council members, one time or another, during elections or otherwise, have pledged to increase openness and transparency within our local governance. They (?) The mayor had an obligation to reveal, for Bill’s sake, in as tactful a fashion as possible, this story and not leave it to the 4th estate (Chapel Hill News)
The process of openness and transparency must be consistent to be reliable. The public trust demands and deserves disclosure.
And yet another lapse in judgment related to a development deal.
Raleigh’s Carlton Place: A Downtown Affordable Housing Commitment Worth Emulating
I’ve followed the ins-and-outs of Raleigh’s Carlton Place before the Wallace Deck/Lot #5 developments took flight.
64 of the 80 units – ranging in size from 800 to 1200 sq./ft. – are priced so those making %60 of Wake County’s median income can afford one.
Market rates aren’t too shabby either (market/affordable): 1 BR/1 BA $700/$550 or less, 1 BR/1 BA (with Den) $750/$570, 2 BR/2 BA $875/$600, 3 BR/2 BA $1,100/$670.
Located at the intersection of E. Davie Street and S. Bloodworth Street, less than two blocks from Moore Square, City Market, and the Exploris and Moore Square Museums Magnet middle schools. Its central location provides residents with easy access to all of downtown’s employment, shopping, professional services, public transit, and cultural and recreational opportunities.
Amenities found at Carlton Place include on-site management and maintenance; a variety of one-, two- and three-bedroom floor plans ranging from about 800 to 1200 square feet; a fitness room, business center and laundry room; walk-in closets; washer and dryer hook-ups; cable television and Internet connections; a picnic area and tot lot; and private, off-street parking.
In addition to the on-site amenities, the project was built to include green design elements that help make it an environmentally friendly and cost-effective place to live. Among the green features of the project are: Energy Star appliances; high efficiency heat pumps; low-VOC carpet and paint; carpet padding made from recycled materials; pervious concrete; and native, drought-resistant plants for landscaping.
Off street parking? Are they nuts?
By contrast, the Lot 5 development offers compact affordable units: “21 one-bedroom units be provided in the project, with a square footage averaging 643 square feet.” Qualification starts at %80 of the regional salary (little less than $50K), with the purchase price set accordingly (to what someone earning $50K/year could “afford”). Condo fees capped at %1.5 of that sales price of the affordable units plus utilities.
Of course, folks will “own” their apartment on Lot #5 while those at Carlton Place will only rent. Chapel Hill’s condo owners, then, will experience a modest growth in equity and see a return on their investment (minus the %1.5 yearly fees) while those in Raleigh don’t.
Ownership is supposed to also reduce unit churn – a favored attribute over apartments – an attribute that appears to be unique to Lot #5 as our local affordable housing advocate Robert Dowling noted when commenting on “Mr. Meadowmont” Roger Perry’s new East 54 (University Inn) project:
Meadowmont developer Roger Perry is planning a major project that challenges the town’s inclusionary affordable housing model.
In exchange for the town’s approving high density — half a million square feet on 11 acres — Perry is offering to double the town’s requirement: 30 percent affordable housing, or 60 out of 200 condos.
Robert Dowling, executive director of the nonprofit Orange Community Housing and Land Trust, praised the idea. But he urged the Town Council to reject it. Dowling said the flood of condos would be harder to manage because condos are smaller starter homes that few people would live in for very long.
Lower-cost condos criticized The News & Observer February 17, 2007
Perry’s East 54 units “one- and two-bedroom units would range in size from 700 to 1,000 square feet and would be priced somewhere in the low $100,000s”.
Bigger, cheaper but will churn faster than those condos on Lot #5? Doesn’t compute.
Back to Raleigh, the taxpayers’ outlay was at least 5-fold less than our taxpayers, $1.5M to our $7.5M.
A $1.5 million loan from the city and county helped the non-profit housing company, DHIC, develop a $10 million project. Apartments are available to families earning 60 percent of the median income. In Raleigh, that’s $43,000 for a family of four.
Larger, cheaper units with on-site parking, no condo fees, many amenities without creating a slew of publicly financed million dollar condos? That computes.
What about that housing cost disparity?
“It’s so important for downtown to give opportunities for multiple classes to help build a life in downtown,†said Kris Larson, deputy director of the Downtown Raleigh Alliance.
It allows people who work in the service industry downtown to live downtown.
“If only people who can live here have to buy a $350,000 condo, what kind of community is that, it’s not very diverse or vibrant,†said Natalie Connell, of DHIC.
Vibrancy. That also computes.
What kind of mix of residents will live in our publicly underwritten Lot #5? Well-to-do students, young professionals, retirees that can drop between $300,000 and $1 million plus on housing?
Raleigh designed in diversity and environmental sanity from the start with their Carlton Place project, as the ‘blog Raleighing reports (Carlton Place Opens With Fanfare):
Eight of the units are set aside for, and affordable to, persons with disabilities. Additionally, 4 units are fully accessible to people with mobility impairments, including curbless showers. One resident benefiting from this is Raleigh native and reigning Ms. Wheelchair North Carolina, Ms. Kelly Woodall.
Carlton Place also received a grant from the Home Depot Foundation to incorporate “Green†elements in the design of the development. Carlton Place features Energy Star appliances, low VOC paint and carpet, pervious concrete, low flow plumbing, and solar reflective roof membranes.
According to Gregg Warren, Executive Director of DHIC, the first residents are employees of The City of Raleigh, Wake County Public Schools, Blue Cross Blue Shield, Capital Area Transit, retail businesses, state government, and Wake Med. Many are now able to walk to work. DHIC is also the developer of Murphy School Apartments and the Prairie Building in downtown Raleigh.
End of the day? If increasing Downtown’s population, diversity and vibrancy in a sustainable, environmentally sound fashion is your goal, Raleigh’s Carlton Place suggests some solutions.
Lot #5 Development: “…up through the ground come a bubbling crude…”
Well, not quite “black gold” or “Texas tea” but it appears that more “refined trouble” is brewing under Lot #5 (MAP).
Chapel Hill’s taxpayers will have to wait for next week’s official lab confirmation but, as of today (Mar. 20th, 2007), initial field tests of some of the nearly 30 core samples show “interesting” signs of contamination.
Hazardous waste remediation involving the fractured geology below the lot could prove to be quite expensive – launching the total taxpayer commitment to just south of the $12.5 million of equity that RAM Development, the Town’s private partner, is contractually obliged to contribute.
Of course, RAM will easily recover their equity and make millions on the deal. The fine folks of Chapel Hill will get an expensive hole in the ground.
Folks started calling on the Council to pull their heads out of the sand and do this environmental assay over a year ago, well before entering final negotiations with RAM Development. Council members Jim Ward and Laurin Easthom, before voting against the Lot #5 proposal, strongly argued that the “known unknown” of contamination deserved evaluation before signing the deal.
Unfortunately, caution, that night, was overridden by the zeal for the deal.
Another expensive “known unknown” lurking in the wings has been the cost of digging two stories below Lot #5’s current grade. I work across Church St. and recall the difficulty the developers of my building had with “the ROCK”. “The ROCK” underneath Chapel Hill’s Downtown has been the bane of many a stalwart developer. UNC has spent millions over the last few years tussling with “the ROCK”.
An incidental consequence of the technician’s drilling cores during this current environmental assay is a better understanding of the parking lot’s underlying geology. The optimism the Town showed – expecting to escape the vicissitudes of other Downtown developers – needs to be tempered by the measured reality of the last few days. It appears, again pending a final report, that “the ROCK” on the Franklin St. side of the lot is roughly 10′ below current grade tapering to 20′ on the Rosemary side.
If you live near Downtown, I suggest an early run to the store for ear plugs before blasting begins 😉
Lot #5 Development: Two Pictures 1,000 Words Apart
Looks like this will be the last Spring I watch these trees bloom…
and the last year I’ll see Chapel Hill’s Downtown signature church steeple from the second floor roost of where I work.
Cline Associates Concept Plan Drawing for Lot #5
Corner of Church St. and Frankin St., Chapel Hill, NC – Mar. 18th, 2007 [MAP]
Not quite “Where’s Waldo?” but, to twist a phrase from Sesame Street, one of these things is not like “reality”.
I remember when many of these trees were planted, have watched them develop over the years. I wonder how long I’ll remember their flowering? The memory of those wonderful gateway trees to University Square and along Franklin, since replaced by the green poles of the Church St. signal lights, are still firmly rooted in my mind, maybe these too will persist.